The short version for your client
If your client wants to spread payments and can wait two to three years, off-plan usually offers a lower entry price and a choice of the best units. If your client wants income or personal use within months, completed property is the answer, even at a higher price. That sentence covers most cases.
Side by side
| Criteria | Off-plan | Completed |
|---|---|---|
| Entry price | Lower at launch; developers raise prices in stages | Market price, sometimes with a resale discount |
| Payment | Reservation, then 20 to 30% at contract, then instalments through construction | Full payment at transfer, usually within 30 to 60 days |
| Unit choice | Best floors and views available | What is left or what a resale owner offers |
| Rental income | Starts after completion, typically 2 to 3 years | Can start immediately |
| Construction risk | Present; depends on developer track record | None |
| Inspection | Show unit and plans only | Walk through the actual unit |
| Registration | At completion, after final payment | At transfer |
What to check for an off-plan project
Three things, and the local team should be able to answer all three without hesitation. First, the developer’s completed projects, with names and years. Second, the EIA approval and construction permit, because a project without them is a brochure, not a building. Third, the payment schedule and what happens if completion is late. Thai law and standard contracts include remedies, but their strength varies by developer.
What to check for a completed unit
Whether the foreign quota is still available in that building. Whether there are unpaid common area fees or sinking fund arrears on the unit. The condition of the building’s reserve fund, because a building with an empty reserve will levy special assessments sooner or later. And, for rental buyers, the actual occupancy and rate history rather than the projected figures.
The mistake to avoid
Do not let a client choose off-plan just because the brochure yield looks higher. Projected yields on off-plan assume a finished building, a full rental programme and a market three years from now. Completed units have a history. Neither is wrong; they are simply different products for different clients.
How the referral works in both cases
You record the client and the brief in the partner account. The IBG Property team in Phuket or Pattaya presents both options where relevant and lets the client decide. Your commission is paid after the transaction closes; for off-plan projects the trigger is defined in the partner terms. Details are on the commission page.
Related pages
IBG Property editorial team. General information for preparing an enquiry. Confirm transaction and cooperation terms with your manager.